top of page
Pipeline Initiation under Drilling Rig
Under what circumstances the project and design team will plan for such unique #StructureInitiation?
Have you been involved in this Return Sheave initiation for a #PLET?
This method definitely requires thorough planning and dynamic installation sequence analysis.
How do you mitigate the clashing risk?
How does the operation team control and monitor the required tension to carry out such PLET initiation safely?
Pipeline Engineering, Pipeline Installation, Subsea Structure, PLET Installation, Installation Engineering
bottom of page